To enhance traffic flow and decongest Delhi-Gurugram section of national highway (NH) 48, the National HIghways Authority of India (NHAI) has begun trial run of the tunnel and underpasses on the Delhi section of Dwarka Expressway starting from Thursday for three hours every day.
“The trials run mark a significant step toward enhancing mobility and reducing congestion in Delhi NCR,” the ministry of road transport and highways said in a statement issued on Wednesday. The tunnel is likely to be fully operational from 5th June 2025.
“The trial period will help NHAI to monitor and evaluate traffic patterns, safety measures, and infrastructure efficiency to ensure seamless integration into the city’s transport network,” it added.
As per the statement, the tunnel has been built using advanced engineering and safety features and is equipped with CCTV surveillance, a dedicated control room, and emergency exits to ensure commuter safety and efficiency.
“The tunnel’s strategic location and layout will benefit a large number of daily commuters and reduce the burden on surface roads and reduce congestion by connecting Dwarka Expressway to the Indira Gandhi International (IGI) Airport,” it added.
“The trials run mark a significant step toward enhancing mobility and reducing congestion in Delhi NCR,” the ministry of road transport and highways said in a statement issued on Wednesday. The tunnel is likely to be fully operational from 5th June 2025.
“The trial period will help NHAI to monitor and evaluate traffic patterns, safety measures, and infrastructure efficiency to ensure seamless integration into the city’s transport network,” it added.
As per the statement, the tunnel has been built using advanced engineering and safety features and is equipped with CCTV surveillance, a dedicated control room, and emergency exits to ensure commuter safety and efficiency.
“The tunnel’s strategic location and layout will benefit a large number of daily commuters and reduce the burden on surface roads and reduce congestion by connecting Dwarka Expressway to the Indira Gandhi International (IGI) Airport,” it added.
You may also like
ITR Filing Deadline Extended: The last date for filing ITR has been extended, this is the new deadline, why was there a need to change it?
Fury as tourist slapped with £170 bill for short overstay at UK seaside town's landmark
Nigel Farage savaged with brutal comment over his maths skills
India will use every method to deal with Pakistan-backed terrorism: Rajnath
Real Madrid set deadline to sign Trent Alexander-Arnold as Xabi Alonso intervenes